1.7.1 Connection Details
1.7.1.1
The Contractor
shall design and detail the connections which are not shown in the Contract Drawings. The type of joint is to follow
the
form of the typical details shown on the Contract Drawings and is to
be designed to carry loads, which shall be
specified.
1.7.1.2
All details designed by the Contractor are to be substantiated by
full calculations certified by a Singapore-registered Professional Engineer.
1.7.2 Temporary Works
1.7.2.2
A Professional Engineer shall be engaged for the design and supervision of the erection of all temporary
works and he shall be responsible for ensuring the safety
and stability of the structure during all
stages of the construction.