REV
|
DATE
|
DESCRIPTION
|
PRPD
|
CHKD
|
REVD
|
APPRD
|
COMPANY
|
0
|
11 June 2014
|
Issue
For Construction
|
|||||
C
|
03
June 2014
|
Issue
For Approval
|
|||||
B
|
10
Apr 2014
|
Issue
For Approval
|
|||||
A
|
10
Mar 2014
|
For Review & Comment
|
|||||
SIGNED (Initials)
|
QA Review (PQM) Sign:
___________________ Date:
________________
NOTES:
a) Revision bar (vertical line) shall be placed
in the right hand margin to indicate where the change has been made.
b) PRPD = Prepared by,
CHKD = Checked by, REVD = Reviewed by
APPRD = Approved by
c) In case of conflict
between any requirements stipulated in this document with the contractual
requirements, the contractual requirements shall prevail.
REVISION LOG
|
|||
REV. No.
|
REV. DATE
|
REV. PAGE
|
REVISION DESCRIPTION
|
A
|
10-Mar-14
|
First
Issue
|
|
B
|
10-Apr-14
|
All
|
Second Issue
|
C
|
03-Jun-14
|
All
|
Third Issue
|
0
|
11-Jun-14
|
Issue For Construction
|
|
TABLE
OF CONTENTS
Section
Description
A.
Inspection
Categories
B.
Notice
(Request) of Inspection
1.0
Material
Receiving Inspection / Quality of
Structural Steel
2.0
Welding/
Welders Qualifications
3.0
Release
for Painting / Erection
4.0
Foundation
Preparation
5.0
Inspection
of Fabricated Items
6.0
Steel
Works Erection
7.0
Field
Welding
8.0
Grouting
9.0
Final
Inspection
10.0
Repair/
Adjustment / Re-Fabrication
11.0
Attachments
Attachment 1 – ITR -QGI-001 Notification (Request) for
Inspection
Attachment 2 –
ITR -QGI-002 Release
Note
Attachment 3 – ITR -QMI-001 Receiving Inspection Report
Attachment 4 – ITR -QCI-011 Structural Steel Works
Checklist
Attachment 5 – ITR -QCI-016
Steel Structure Fabrication
Attachment 6 – ITR -QCI-017
Bolt Torque Record for Structural Steel
Attachment 7 – ITR -QCI-018 Installation Record for
Structural Steel
Attachment 8– ITR -QCI-019
Welding Inspection Record
Attachment 9– ITR -QCI-020
Foundation Pad Inspection Report
Attachment 10– ITR -QCI-023
Paint Inspection Report
Attachment 11– ITR -QCI-025 Final Inspection for Structure Steel
A.
Inspection Categories
The following inspection categories shall be used to identify the
extent of inspection for each inspection activity within the ITP
I Inspection
items:
It is the primary
responsibility of Subcontractor and/or CONTRACTOR’s Quality Department to
carry out the necessary inspection and test to assure conformance to the Contract
requirements, drawings, specification and related codes and standards.
S Surveillance
Monitor the status of work and
materials and analyses of records on a periodical basis to ensure that
specified requirements are being fulfilled.
W Witness
As mandatory items of inspection, examination, or test this stage shall
be notified in advance by the Subcontractor or CONTRACTOR’s construction
department and shall be performed under witness of the relevant Inspection
Authority. However, work may proceed if the relevant authority is not available
at the required time.
H HOLD
Hold point (H) means a point,
designated by prior stated agreement in the inspection and test plan(s), at
which the performance of an activity must be stopped and put an hold until
specified actions are completed.
R
Review
Review results of inspection, examination or test.
B.
Notice (Request) of Inspection
Definition
of terms:
Ø
Contractor, refers to Hyundai HEC-JV
organization or individual that contracts with another organization or
individual (the owner) for the construction of a building, road or other
facility
Ø
Subcontractor,
an individual or business that signs a contract to perform part or all of the
obligations of another’s contract from Hyundai HEC-JV as Contractor
The Subcontractor shall submit to CONTRACTOR a ‘Notice
of Inspection Request one (1) day before the inspection is to be carried out.
The request shall contain information as follows:
·
Inspection item(s).
·
Responsibility Category. (as
defined within the ITP)
·
Date, place and time of
inspection.
·
Requirement for third party
inspection (if any).
·
Any other relevant information.
The Subcontractor may proceed with the inspection
activity at the specified time without the presence of CONTRACTOR or COMPANY for witness inspection unless a delay has been previously advised and agreed by either
party.
·
The Notice of Inspection shall
be sequentially numbered by the subcontractor in accordance with SUT1-Z05-G-00-4-016‘Numbering Procedure for Project Quality Documents’.
·
The Site Inspection and Test
Procedure (SUT1-Z05-Q 00-4-022) shall be implemented for the Structural Steel
Works (Fabrication & Erection).
·
Site Receiving Procedure (SUT1-Z05-Q
00-4-023) shall govern fort the proper handling of materials and its
components. This procedure is to assign
responsibility and describe the methods of performing receiving inspection on
Equipements & Materials arriving at the site to ensure that thet comply
with the purchase order and project requirements
·
Welder & Welding Operator
Qualification Procedure (SUT1-Z05-Q 00-4-030) will also be implemented. This procedure is to establish the
requirements and control measures for Performance Tests of Welder and Welding
Operator Qualification Tests for EfW Project @ Sakra at Jurong Island
Singapore. It is intended to apply to qualifications in construction sites.
·
Welding materials Control
Procedure (SUT-Z05-Q 00-4- 029). This procedure will describes the general
requirements for welding consumable of storing, handling,distributing and
issuing welding consumables on the construction site
No.
|
Activity and Characteristic
to be Checked
|
Reference Documents (Codes/
Std/ Spec. / Proc.)
|
Acceptance Criteria
|
Verifying Document
|
Inspection Points
|
||||
Subcon
|
CONTR.
|
RE/RTO
|
SCC
|
Lab
|
|||||
1.0
|
Material Receiving
Inspection
|
||||||||
1.1
|
- Receiving
Inspection of Materials
- Confirm material
storage condition
|
SUT1-Z05-Q 00-4-023
Site Receiving Inspectiin Procedure
|
Approved
Construction Drawing – Issued for Construction (IFC) & Mill Certificates
& Factory Production Control Certificates (FPC), No physical defects,
Safeguards against adverse environment
|
ITR-QMI-001-Receiving Inspection Report
|
I
|
W/R
|
W/R
|
S
|
|
1.2
|
Receipt inspection of welding consumables
|
SUT1-Z05-Q 00-4-023-
Site Receiving Inspection Procedure
|
Low
hydrogen/min. Tensile strength 480N/mm². As per manufacturers
recommendations. Storage-Temp. & Humidity control environment
|
ITR-QMI-001- Receiving Inspection Report
|
I
|
R
|
S
|
S
|
|
2.0
|
Welding/ Welders
Qualifications
|
||||||||
2.1
|
Confirmed Welding Procedure Specification
|
SUT1-Z05-Q00-4-005 WPS
(AWS D1.1 Prequalified)
|
Approved WPS & PQR
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-011 Structural Steel Checklist(para. 2 &
4)
ITR-QCI-016- Steel Structure Fabrication
|
I
|
R
|
R
|
R
|
|
2.2
|
Cofirmed Welders(Welders Qualification Test & Contro)
|
SUT1-Z05-Q00-4-030
Welder &
Welding Operator qualification Procedure
SUT1-Z05-Q00-4-021 General Welding Procedure
|
Conforming the AWS D1.1, Approved WPS
& PQR
|
ITR-QCI-0011 Structural Steel Checklist- para. 2
& 4)
Welder or Welding Operator Performance Qualification Record
|
I
|
W/R
|
W
|
R
|
|
3.0
|
Foundation
Preparation
|
||||||||
3.1
|
Confirmation
acceptance of foundation
|
Approved Construction
Drawing
- (IFC)
|
Signed “Release Form”
from Concrete casting subcontractor/contractor
|
QGI-002 Release Note
|
I
|
R
|
R
|
R
|
|
3.2
|
Control foundation
level pad elevation & location
|
Approved Construction
Drawing
- (IFC)
|
Elevation tolerance EL. ± 2mm., As
per specification
|
ITR-QCI-020- Foundation Pad Inspection Report
|
I
|
W/R
|
W/R
|
R
|
|
4.0
|
Inspection of
Fabricated Items
|
||||||||
4.1
|
Confirm Dimension
Verification,(Before Erection)
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)AWS D1.1/ D1.1M
|
ITR-QCI-0011- Structural Steel Checklist- para. 2
& 4)
|
I
|
W
|
R
|
S
|
|
4.2
|
Visual inspection of workmanship including
weld quality
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)AWS D1.1/ D1.1M
|
ITR-QCI-0011 Structural Steel Checklist- para. 2
& 4)
|
I
|
W
|
S
|
S
|
|
5.0
|
Steel Works Erection
|
||||||||
5.1
|
Confirm column
plumbness
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-0018 Installation
Record For Structural Steel
|
I
|
W/R
|
W/R
|
S
|
|
5.2
|
Confirm bracings are properly insta SUT0-All-C08-4-004lled
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-011 Structural Steel Checklist(para. 5)
|
I
|
S
|
S
|
S
|
|
5.3
|
Confirm handrails, gratings, & stairways are correctly installed
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-011 Structural Steel Checklist(para. 5)
|
I
|
S
|
S
|
S
|
|
6.0
|
Bolting
|
||||||||
6.1
|
Confirm all nuts, bolts & washers have been fitted.
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-011 Structural Steel Checklist(para. 3)
|
I
|
S/W
|
S
|
S
|
|
6.2
|
Confirm erection bolts have been replaced with high strength bolts(where
applicable)
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-011 Structural Steel Checklist(para. 3)
|
I
|
S/R
|
S/R
|
S
|
|
6.3
|
Confirm bolt torque
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-0017 Bolt Torque
Inspection record for Structural Steel
|
I
|
W/R
|
W/R
|
R
|
|
7.0
|
Field Welding (As per
Drawing- Field Points)
|
||||||||
7.1
|
Confirm welding works is carried out in
accordance
with approved procedures
|
SUT1-Z05-Q00-4-006 WPS & PQR procedure
|
Conforming
the AWS D1.1
Approved
WPS & PQR
|
ITR-QCI-0019 Welding Inspection Record
|
I
|
S/R
|
S/R
|
S
|
|
7.2
|
Visual Inspection of welding
|
SUT1-Z05-Q00-4-006 - WPS & PQR Pprocedure
|
Conforming
the AWS D1.1
Approved
WPS & PQR
|
ITR-QCI-0011 Structural Steel Checklist(para 4)
|
I
|
W/R
|
W/R
|
S
|
|
7.3
|
Non Destructive Testing (NDT) of welding works
(As per
11.0 NDE)
|
SUT1-Z05-Q00-4-006
- WPS & PQR Procedure
SUT0-All-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-0019 Welding Inspection Record
|
I
|
W/R
|
W/R
|
S/R
|
|
8.0
|
Grouting
|
||||||||
8.1
|
Confirm grouting is complete
|
Approved
Construction Drawing – Issued for Construction (IFC)
|
Grouting must be done after column verticality is
plumbed
|
Grout Inspection & Test reports
|
I
|
W
|
S
|
S
|
|
8.2
|
Confirm final anchor bolt torque after
grouting
|
Approved
Construction Drawing – Issued for Construction (IFC)
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-025- Final inspection for Structure Steel
|
I
|
W
|
R
|
S
|
|
9.0
|
Final Inspection
|
||||||||
9.1
|
Carry out Final inspection of the structure
|
Approved Construction Drawings
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
I
|
W
|
R
|
W
|
||
10.0
|
Repair/
Adjustment & Re-fabrication
|
||||||||
10.1
|
Confirmed
material
- Receiving Inspection of Materials
|
Site Receiving Procedure (SUT1-Z05-Q 00-4-023)
|
Approved Construction Drawing – Issued for
Construction (IFC) & Mill Certificates & Factory Production Control
Certificates (FPC), No physical defects, Safeguards against adverse
environment
|
ITR-QMI-001- Receiving Inspection Report
|
I
|
W/R
|
W/R
|
S
|
|
10.2
|
Marking & Cutting
|
SUT1-Z05-Q00-4-005 WPS (AWS
D1.1 Prequalified)
|
Approved Construction Drawing – Issued for
Construction (IFC), Approved tolerance – ASCI specification for Structural
Steel Buildings
|
ITR-QCI-016- Steel Structure Fabrication
|
I
|
W
|
S
|
S
|
|
10.3
|
Fit up Check
|
SUT1-Z05-Q00-4-005 WPS (AWS D1.1
Prequalified)
|
Approved joint detail As per WPS.
|
ITR-QCI-016- Steel Structure Fabrication
|
I
|
W
|
S
|
S
|
|
10.4
|
Confirm Final Dimension Check
|
SUTO-ALL-C08-4-004
|
Approved Construction Drawing – Issued for
Construction (IFC)
|
ITR-QCI-016- Steel Structure Fabrication
|
I
|
W
|
S
|
S
|
|
10.5
|
Welding Visual Inspection
- Full Penetration
welds 100%
- Partial penetration
welds 50%
- Fillet welds 25%
|
SUT1-Z05-Q00-4-005 (WPS)
(AWS D1.1 Prequalified)
|
AWS D1.1 Tabl;e 6.1
& 6.2
All lifting lugs 100%
MPI Test
- Verify NDT % has
been completed
|
ITR-QCI-016- Steel Structure Fabrication
|
I
|
W/R
|
W/R
|
S
|
|
11.0
|
NDE
|
||||||||
11.1
|
RT or UT - Full penetration Butt
Welds 50 % and Magnetic(MT) or Dye
penetrant testing (PT) 50% (for site
welds the above will be 100%)
UT or M/ PT - Partial penetration
Butt Welds Min.25% & MT/PT 25%
(for site welds the above will be 50%)
MT or PT - Fillet Welds Min 20% (for site welds the above will be
50%)
|
SUTO-ALL-C08-4-004
|
AWS D1.1 Tabl;e 6.1
& 6.2
|
NDE Report
|
I
|
W/R
|
W/R
|
S
|
|
11.2
|
Re-Painting/ Galvanizing (Touch up - Cold )
- Surface preparation
- Thickness of Zinc Coating/ Painting
Cointing Dry film
|
Approved MS for Painting Works
|
Approved Materials Specification , Material Brochure & Catalogue Specification
|
ITR-QCI-023 Painting Inspection Report
|
I
|
S/R
|
S/R
|
S/R
|
|
11.3
|
Adhesion Test(If necessary –Random sample Test)
|
SUTO-ALL-C08-4-004
SUTO-ALL-P08-4-008
|
As per ASTM D-3359/ISO 2409 (Type Type) or
As per ASTM D-4541/ISO 2624 ( Dolly pull-off))
|
ITR-QCI-023 Painting Inspection Report
|
I
|
W/R
|
W/R
|
S
|
LEGEND: ITL: Independent Testing Laboratory I:
Execution of Inspection and Test R: Review S: Surveillance W:
Witness H : Hold
11.0 Attachments
Attachment 1 – ITR -QGI-001 Notification (Request) for Inspection
Attachment 2 –
ITR -QGI-002 Release
Note
Attachment 3 – ITR -QMI-001 Receiving
Inspection Report
Attachment 4 – ITR -QCI-011 Structural Steel Works
Checklist
Attachment 5 – ITR -QCI-016 Steel Structure Fabrication
Attachment 6 – ITR -QCI-017
Bolt Torque Record for Structural Steel
Attachment 7 – ITR -QCI-018 Installation Record for
Structural Steel
Attachment 8– ITR -QCI-019
Welding Inspection Record
Attachment 9– ITR -QCI-020
Foundation Pad Inspection Report
Attachment 10– ITR -QCI-023
Paint Inspection Report
Attachment 11– ITR -QCI-025 Final Inspection for Structure Steel
Great blog post and really helpful and your blog are very interesting
ReplyDeleteclick here
Steel for structure
ReplyDeleteHi, I am new to industrial construction and need some help and guidance about ITPs.
ReplyDeleteDo you have a downloadable folder of all ITPs in construction such as Earthworks, Structural steel, pre-cast concrete walls, Concrete, painting, electrical, plastering, roofing, services etc?
Is there a over-arching framework or plan and the sequence of all construction activities? Your help is much appreciated.
Pls I neeed help with Itp for steel construcction
ReplyDeleteThe author wrote it in detail, which gave me a better understanding of steel structures. In my blog (https://spaceframesafs.blogspot.com/), I also introduced the relevant information of the steel structure space frame, you can use it as a reference .
ReplyDeleteThanks to the author for sharing here, my blog (https://spaceframesafs.blogspot.com/) also shared a lot of knowledge news about steel structures, space frames and trusses, I hope it can help everyone.
ReplyDeleteI can't access to the attachments of this post
ReplyDeletecan anyone help me?